Scratchpad ()
Your search: For sale studio, 1-bedroom apartment, 2-bedroom apartment, 3-bedroom apartment, multi-bedrooms apartment, maisonette, house, shop, city of Bourgas, Price max € 155 000 (22 Offers)
6
Completion date: 05.2027, Stage of construction: rough construction completed
Floor: ground floor, brick / after 2010, Stage of construction: permission to use
3
Yard area: 140 m2, Bedrooms: 1, Floors: 1, Stage of construction: permission to use
13
Bedrooms: 1, Floor: 1, Floors: 5, panel / 1980s, Stage of construction: permission to use
We may have offers that match your search but are not officially announced for privacy reasons. If you would like to receive information about our confidential offers, please fill out the request form.
6
NO COMMISSION
Apartments for sale, Meden rudnik, prices from € 57 600
Completion date: 12.2024, Stage of construction: Rough construction
3
Floor: ground floor, Floors: 6, brick / after 2010, Stage of construction: permission to use
The shop is part of a six-storey building, situated on the ground floor.Distribution: one room, storage and a toilet.DEGREE OF COMPLETENESSWindows - PVC;Walls and ceilings - gypsum plaster;Floors - cement ...
Bedrooms: 1, Floor: ground floor, brick
18
Completion date: 03.2023, Stage of construction: elevation 4 floor
3
Bedrooms: 1, Floor: 7, Floors: 13, reinforced concrete structure with hanging facade and brickwork, Completion date: 12.2023, Stage of construction: elevation 6 floor
3
Bedrooms: 1, Floor: 8, Floors: 13, reinforced concrete structure with hanging facade and brickwork, Completion date: 12.2023, Stage of construction: elevation 6 floor
18
Completion date: 05.2026, First line without sea view, Stage of construction: the building is completed up to the roof cornice
7
Completion date: 12.2026, Stage of construction: approved design
10
NO COMMISSION
Apartments for sale, Angel Dimitrov St, Sarafovo, prices from € 92 988
Completion date: 05.2027, First line with sea view, Stage of construction: approved design
10
Bedrooms: 1, Floor: 2, Floors: 5, brick / after 2010, Distant sea view, Stage of construction: permission to use
11
Completion date: 02.2028, Stage of construction: foundation level
9
Completion date: 03.2028, Stage of construction: approved design